Author: Novade Solutions
To ensure proper installation and performance of soundproofing materials in ceilings, and maintenance to control noise and improve acoustics
Published on: 1/24/2025A.1.1 Material type:
A.1.2 Brand:
A.1.3 Color:
A.1.4 Origin:
A.1.5 Type of Joint:
A.1.6 Material Sample:
A.1.7 Complete Suspension System:
A.1.8 Edge Moldings:
A.1.9 Fire-resistance rating:
A.10 Conformance to ASTM or other standards:
A.2.1 Shopdrawings layout/pattern:
A.2.2 Connection Details:
Add Photo


B.1 Acceptable Structure for attachment of system:
B.2 Correct Reference Elevation:
B.3 Correct Ceiling Height:
B.4 Installation & Testing of all utility lines (ductworks, lighting/electrical lines, sanitary lines, sprinkler heads):
B.5 Adequate hangers & supports:
B.6 Check alignment of pattern with walls and floor layout:
B.7 Requirement for access panels:
B.8 Installed hangers in concrete:
B.9 Clean, straight, sharply defined profiles, free from defects:
B.10.a Finished of exposed surface:
B.10.b b. Surfaces in contact with masonry or dissimilar metals:
B.11 Clearance from installed utility lines (ductworks, lighting/electrical lines, sanitary lines, sprinkler systems):
B.12 Supports for lighting fixtures:
B.13 Installation of edge mouldings:
B.14 Supports for blinds/draperies/shutters:
B.15 Proper protection from direct exposure to water and weather:
B.16 Expansion joints:
B.17 Installation of edge mouldings:
Add Photo


C.1 Proper storage of materials:
Attachment(s):


Download PDF
Save to Novade
Acoustical Ceiling Treatment Checklist
A.1.1 Material type:
A.1.2 Brand:
A.1.3 Color:
A.1.4 Origin:
A.1.5 Type of Joint:
A.1.6 Material Sample:
A.1.7 Complete Suspension System:
A.1.8 Edge Moldings:
A.1.9 Fire-resistance rating:
A.10 Conformance to ASTM or other standards:
A.2.1 Shopdrawings layout/pattern:
A.2.2 Connection Details:
Add Photo


B.1 Acceptable Structure for attachment of system:
B.2 Correct Reference Elevation:
B.3 Correct Ceiling Height:
B.4 Installation & Testing of all utility lines (ductworks, lighting/electrical lines, sanitary lines, sprinkler heads):
B.5 Adequate hangers & supports:
B.6 Check alignment of pattern with walls and floor layout:
B.7 Requirement for access panels:
B.8 Installed hangers in concrete:
B.9 Clean, straight, sharply defined profiles, free from defects:
B.10.a Finished of exposed surface:
B.10.b b. Surfaces in contact with masonry or dissimilar metals:
B.11 Clearance from installed utility lines (ductworks, lighting/electrical lines, sanitary lines, sprinkler systems):
B.12 Supports for lighting fixtures:
B.13 Installation of edge mouldings:
B.14 Supports for blinds/draperies/shutters:
B.15 Proper protection from direct exposure to water and weather:
B.16 Expansion joints:
B.17 Installation of edge mouldings:
Add Photo


C.1 Proper storage of materials:
Attachment(s):