Blasting Contractors Checklist

Author: Novade Solutions

Ensure blasting work complies with safety rules, permits, and site standards using this checklist for blasting contractors

Published on: 9/10/2025

Blasting Contractors Checklist

General information

Review of proposed procedures & equipment - Explosives

In serviceable condition:

Transported and stored correctly:

Blast design

Burden and spacing to optimise fragmentation:

Ground vibration/air-blast - design and monitoring:

Charging holes

Holes checked for water/obstruction:

Holes checked for extreme deviation:

No metal materials or tamping:

Flyrock

Clear benches and floors of loose rock:

Adequate burden and stemming:

Static electricity

Earthing of bulk loaders:

Suspend operations if necessary:

Wiring circuits - electric

Correct connectors/ test before firing:

Wiring circuits - non electric

Correct connectors / inspect before firing:

Electrical storms - lightning

Make safe - clear area:

Unauthorised access

Restrict access / signs / barricades:

Warning siren:

Fumes / Gases

Restrict access until cleared:

Misfire / partial detonation

Inspect and make safe before resuming work:

Ground vibration / airblast

Appropriate shot design / monitoring:

Lack of co-ordination

Quarry manager or delegate to supervise:

Direct communication with Quarry manager:

Further information

General Notes

Attachment(s):


samplesample with link badge

pdf icon

Document.pdf

close icon
excel icon with link badge

Sheets.xlsx

link off
  • Download PDF

    Download PDF

  • Save to Novade

    Save to Novade

Blasting Contractors Checklist

General information

Review of proposed procedures & equipment - Explosives

In serviceable condition:

Transported and stored correctly:

Blast design

Burden and spacing to optimise fragmentation:

Ground vibration/air-blast - design and monitoring:

Charging holes

Holes checked for water/obstruction:

Holes checked for extreme deviation:

No metal materials or tamping:

Flyrock

Clear benches and floors of loose rock:

Adequate burden and stemming:

Static electricity

Earthing of bulk loaders:

Suspend operations if necessary:

Wiring circuits - electric

Correct connectors/ test before firing:

Wiring circuits - non electric

Correct connectors / inspect before firing:

Electrical storms - lightning

Make safe - clear area:

Unauthorised access

Restrict access / signs / barricades:

Warning siren:

Fumes / Gases

Restrict access until cleared:

Misfire / partial detonation

Inspect and make safe before resuming work:

Ground vibration / airblast

Appropriate shot design / monitoring:

Lack of co-ordination

Quarry manager or delegate to supervise:

Direct communication with Quarry manager:

Further information

General Notes

Attachment(s):


samplesample with link badge

pdf icon

Document.pdf

more icon
excel icon with link badge

Sheets.xlsx

more icon
Use this Blasting Contractors Checklist to ensure all blasting operations follow safety protocols, regulatory compliance, and site-specific requirement