Demolition Permit Template | Novade

Author: Novade Solutions

An easy-to-use demolition permit template at your fingertips. Simplify your projects by easily tracking permits, deadlines, and compliance requirements.

Applied tags:
PTW
Published on: 11/5/2024

Demolition Permit

General Information

Items to Check

*1.Workers briefed on risk assessment, safe work procedures, and adequately trained according to Method Statement.

*2.Workers equipped with proper PPEs required for the demolition operation.

*3.Structures cleared by competent person for safe demolition.

*4.Underground services identified and diverted/cut off before demolition. (PUB gas/water pipes, electrical cables, Telecom optical fibre and cables)

*5.Falling objects removed and proper netting/canvas provided to hold debris.

*6.Area barricaded and warning sign displayed.

*7.Glass, asbestos containing materials, cladding and external architectural fittings removed.

*8.Noise and dust mitigation measures in place prior commencement of demolition operation.

*9.Machinery and equipment in good condition.

*10.Adjoining building/structures reviewed and any identified risk has been adequately controlled

*11.Adequate lighting provided (including emergency lighting).

Remarks

  • Download PDF

    Download PDF

  • Save to Novade

    Save to Novade

Demolition Permit

General Information

Items to Check

*1.Workers briefed on risk assessment, safe work procedures, and adequately trained according to Method Statement.

*2.Workers equipped with proper PPEs required for the demolition operation.

*3.Structures cleared by competent person for safe demolition.

*4.Underground services identified and diverted/cut off before demolition. (PUB gas/water pipes, electrical cables, Telecom optical fibre and cables)

*5.Falling objects removed and proper netting/canvas provided to hold debris.

*6.Area barricaded and warning sign displayed.

*7.Glass, asbestos containing materials, cladding and external architectural fittings removed.

*8.Noise and dust mitigation measures in place prior commencement of demolition operation.

*9.Machinery and equipment in good condition.

*10.Adjoining building/structures reviewed and any identified risk has been adequately controlled

*11.Adequate lighting provided (including emergency lighting).

Remarks

Tailor your demolition permit applications to your specific project needs with our customisable demolition permit to work template. Save time while maintaining compliance.