Author: Novade Solutions
Published on: 3/29/2022*A.1.1 Material Type:
*A.1.2 Series:
*A.1.3 Origin:
*A.1.4 Physical Sample:
*B.1 Check rough surface:
*B.1.1 Slope Clearances:
*B.1.2 Alignment for less cutting:
*B.2 Elevation alignment:
*B.3 Preparation for mixing of cement:
*B.4 Application of topping:
*B.5 Stone flooring installation:
*B.6 Check clearances:
*B.7 Application of adhesive:
*B.8 Joint filler:
*B.9 Grinding/sanding of flawed finish:
*B.10 Retouching:
*B.11 Final grinding/sanding:
*B.12 Check corner edge:
*B.13 Polish:
*B.14 Cleaning:
*B.15 Protection of installed materials:
*C.1 Proper Storage of Materials
Attachment(s):


Download PDF
Save to Novade
Finishes - Stone Flooring Inspection
*A.1.1 Material Type:
*A.1.2 Series:
*A.1.3 Origin:
*A.1.4 Physical Sample:
*B.1 Check rough surface:
*B.1.1 Slope Clearances:
*B.1.2 Alignment for less cutting:
*B.2 Elevation alignment:
*B.3 Preparation for mixing of cement:
*B.4 Application of topping:
*B.5 Stone flooring installation:
*B.6 Check clearances:
*B.7 Application of adhesive:
*B.8 Joint filler:
*B.9 Grinding/sanding of flawed finish:
*B.10 Retouching:
*B.11 Final grinding/sanding:
*B.12 Check corner edge:
*B.13 Polish:
*B.14 Cleaning:
*B.15 Protection of installed materials:
*C.1 Proper Storage of Materials