GENERAL PERMIT (7 Day PTW)

Author: Novade Solutions

Novade streamlines the management of 7-day general permits, ensuring efficient approvals, compliance tracking, and improved site safety oversigh

Published on: 11/29/2024

GENERAL PERMIT (7 Day PTW)

Section 1: Pre-Operation Details

This permit is valid for 7 days from time of approval. Application shall be submitted at least 1 day in advance.

Attach Drawing / Sketch


samplesample with link badge

All categories of work listed below shall be considered Coldwork

Photos


samplesample with link badge

*Signature


sample signature

Section 2: Preparation by Contractor Supervisor

*1. Safe work procedure and Risk Assessment briefed to all workers involved? point?

*2. Proper barricade with warning signage put up at work area?

*3. No incompatible works in / near work area?

*4. Appropriate PPE issued and worn by worker?

*5. Area checked by Licensed cable detection worker (LCDW) before start of any excavation/trial holes?

*Signature by Contractor Supervisors to verify above checklist


sample signature

Section 3: Evaluation by Contractor Safety Assessor / Competent Person

Select Yes to verify the item

1. Work personnel briefed on risk-impact assessment of the work scope?

2. Is PPE adequate and appropriate for this job as indicated by permit applicant?

3. Work area is safe. Environmental impacts are eliminated.

4. Have you confirmed that no incompatible works being carried out in/ near your work area?

5. Reasonably practicable measures have been taken to safe guard the safety and health of work personnel and preservation of the environment?

Photo, if any


samplesample with link badge

*Contractor Safety Assessor / Competent Person Signature


sample signature

Section 4: Authorisation

VERIFICATION BY Engineer / Site Supervisor:

*Engineer / Site Supervisor Signature


sample signature

ACKNOWLEDGEMENT BY SFEC HSSE Dept:

*HSSE Dept. Rep. Signature


sample signature

APPROVAL BY WAH MANAGER

Permit Approver

*This Permit is:-

*Project Manager/Construction Manager Signature


sample signature

After Day 1 Approval

*Signature


sample signature

*Signature


sample signature

*Signature


sample signature

*Signature


sample signature

*Signature


sample signature

*Signature


sample signature
  • Download PDF

    Download PDF

  • Save to Novade

    Save to Novade

GENERAL PERMIT (7 Day PTW)

Section 1: Pre-Operation Details

This permit is valid for 7 days from time of approval. Application shall be submitted at least 1 day in advance.

Attach Drawing / Sketch


samplesample with link badge

All categories of work listed below shall be considered Coldwork

Photos


samplesample with link badge

*Signature


sample signature

Section 2: Preparation by Contractor Supervisor

*1. Safe work procedure and Risk Assessment briefed to all workers involved? point?

*2. Proper barricade with warning signage put up at work area?

*3. No incompatible works in / near work area?

*4. Appropriate PPE issued and worn by worker?

*5. Area checked by Licensed cable detection worker (LCDW) before start of any excavation/trial holes?

*Signature by Contractor Supervisors to verify above checklist


sample signature

Section 3: Evaluation by Contractor Safety Assessor / Competent Person

Select Yes to verify the item

1. Work personnel briefed on risk-impact assessment of the work scope?

2. Is PPE adequate and appropriate for this job as indicated by permit applicant?

3. Work area is safe. Environmental impacts are eliminated.

4. Have you confirmed that no incompatible works being carried out in/ near your work area?

5. Reasonably practicable measures have been taken to safe guard the safety and health of work personnel and preservation of the environment?

Photo, if any


samplesample with link badge

*Contractor Safety Assessor / Competent Person Signature


sample signature

Section 4: Authorisation

VERIFICATION BY Engineer / Site Supervisor:

*Engineer / Site Supervisor Signature


sample signature

ACKNOWLEDGEMENT BY SFEC HSSE Dept:

*HSSE Dept. Rep. Signature


sample signature

APPROVAL BY WAH MANAGER

Permit Approver

*This Permit is:-

*Project Manager/Construction Manager Signature


sample signature

After Day 1 Approval

*Signature


sample signature

*Signature


sample signature

*Signature


sample signature

*Signature


sample signature

*Signature


sample signature

*Signature


sample signature
Manage 7-day general permits efficiently with Novade: streamline approval processes, ensure compliance, and enhance site safety management