Lifting Plan

Author: Novade Solutions

Published on: 7/6/2022

Lifting Plan

Lifting Plan - General Information

Items to Check - A. General

*1. RA / SWP Submitted

*2. RA / SWP briefed

B. Details of the loads

*1. Description of loads

*2. Overall Dimensions

*3. Weight of load in kg/tonne

*4. Known Weight/Estimated Weight

C. Details of Lifting Equipment / Lifting Gears to be used

*1. Type of Crane

*2. Max SWL as certified on the LM Certificate

*3. Intended Work Radius

*4. Combined Weight of the lifting gears

*5. Make & Model

*6. LM Certificate No & Date of expiry

*7. SWL at this radius

*8. Attach Certificate of Lifting Gears

*9. Type of Lifting gears

*10. Lifting accessories to be used

*10.1. Lifting gear / accessories

*10.2. LG Certificate

*10.3. SWL

*10.4. Expiry date

*10.5. Date of Last inspection

*11. Attach Lifting Geometry Diagram

D. Means of Communication

*1. Can the Operator see the loading and unloading point for the load from his position?

*2. What are the means of communication between lifting crew

E. Physical and environmental consideration

*1. Ground Conditions

*1.1. Is the ground made safe (eg. Placing steel plate)

*1.2. Are the outriggers evenly extended?1.2. Are the outriggers evenly extended?

*2. Obstacles

*2.1. Are there any overhead obstacles such as power lines?

*2.2. Are there nearby buildings or structure, equipment or stacked materials that may obstruct lifting operation from being carried out safely

*3. Lighting

*3.1. Is the lighting condition adequate?

*4. Demarcation

*4.1. Has the zone of operation been barricaded (with warning signs and barriers) to prevent unauthorized access?

*5. Environment

*5.1. Do not proceed with the lifting operation under the following circumstances: Thunderstorm and lightning strikes in the area. The ground condition must be checked after a thunderstorm

*6. Remarks

  • Download PDF

    Download PDF

  • Save to Novade

    Save to Novade

Lifting Plan

Lifting Plan - General Information

Items to Check - A. General

*1. RA / SWP Submitted

*2. RA / SWP briefed

B. Details of the loads

*1. Description of loads

*2. Overall Dimensions

*3. Weight of load in kg/tonne

*4. Known Weight/Estimated Weight

C. Details of Lifting Equipment / Lifting Gears to be used

*1. Type of Crane

*2. Max SWL as certified on the LM Certificate

*3. Intended Work Radius

*4. Combined Weight of the lifting gears

*5. Make & Model

*6. LM Certificate No & Date of expiry

*7. SWL at this radius

*8. Attach Certificate of Lifting Gears

*9. Type of Lifting gears

*10. Lifting accessories to be used

*10.1. Lifting gear / accessories

*10.2. LG Certificate

*10.3. SWL

*10.4. Expiry date

*10.5. Date of Last inspection

*11. Attach Lifting Geometry Diagram

D. Means of Communication

*1. Can the Operator see the loading and unloading point for the load from his position?

*2. What are the means of communication between lifting crew

E. Physical and environmental consideration

*1. Ground Conditions

*1.1. Is the ground made safe (eg. Placing steel plate)

*1.2. Are the outriggers evenly extended?1.2. Are the outriggers evenly extended?

*2. Obstacles

*2.1. Are there any overhead obstacles such as power lines?

*2.2. Are there nearby buildings or structure, equipment or stacked materials that may obstruct lifting operation from being carried out safely

*3. Lighting

*3.1. Is the lighting condition adequate?

*4. Demarcation

*4.1. Has the zone of operation been barricaded (with warning signs and barriers) to prevent unauthorized access?

*5. Environment

*5.1. Do not proceed with the lifting operation under the following circumstances: Thunderstorm and lightning strikes in the area. The ground condition must be checked after a thunderstorm

*6. Remarks