Lorry Crane Checklist

Author: Novade Solutions

Use this Lorry Crane Checklist template to ensure the necessary safety checks are made before operating a Lorry Crane.

Published on: 7/6/2022

Lorry Crane Checklist

General Information

Items to Check - A. Engine

*1. Oil, water and fuel topped up to safe levels.

*2. No sign of oil, water or fuel leakage.

*3. Proper fan belt tension

*4. Air receiver clean

B. Hydraulic System

*1. Hydraulic oil topped up to safe level.

*2. Control lever and valve in good working condition

*3. Pump is in good working condition

*4. Motor is in good working condition

*5. No sign of oil leakage for hydraulic pump, motor and cylinders

*6. Control valve, rotating joint and piping oil leakage

C. Electrical System

*1. Fluid level in battery is acceptable

*2. Instruments in working condition

D. Safety Devices

*1. All the crane's controls are functioning properly (without load)

*2. All the crane's safety devices are functioning properly.

*3. Condition of boom and jib and hooks are satisfactory.

*4. Linkages, swivels, pins and other retaining devices are in position.

  • Download PDF

    Download PDF

  • Save to Novade

    Save to Novade

Lorry Crane Checklist

General Information

Items to Check - A. Engine

*1. Oil, water and fuel topped up to safe levels.

*2. No sign of oil, water or fuel leakage.

*3. Proper fan belt tension

*4. Air receiver clean

B. Hydraulic System

*1. Hydraulic oil topped up to safe level.

*2. Control lever and valve in good working condition

*3. Pump is in good working condition

*4. Motor is in good working condition

*5. No sign of oil leakage for hydraulic pump, motor and cylinders

*6. Control valve, rotating joint and piping oil leakage

C. Electrical System

*1. Fluid level in battery is acceptable

*2. Instruments in working condition

D. Safety Devices

*1. All the crane's controls are functioning properly (without load)

*2. All the crane's safety devices are functioning properly.

*3. Condition of boom and jib and hooks are satisfactory.

*4. Linkages, swivels, pins and other retaining devices are in position.