Risk Assessment and Method Statement Review

Author: Novade Solutions

Identify potential hazards and risks involved when performing work activities in projects and provide standard control measures.

Published on: 11/26/2024

Risk assessment and method statement review

General Information

Add Photo Documentation


samplesample with link badge

Check - Guidance on aspects that should be covered

1. Scope of work - Brief description of work with scope defined by area, floor or structure (where specified conditions dictate). Should also define any limitations of use and must be site specific.

2. Organisation - Key staff involved in managing and supervising the work and the anticipated type of labour required, including any required induction, training and proof of competence

3. Materials - Materials required, including storage location, any identifying marks and anyspecial safety measures to be taken during storage, handling, use and protection. COSHH details as required.

4. Plant/equipment - Major plant and equipment required, including any lifting equipment and anyplant or equipment calibration/certification/thorough examinations: 12-monthlyor 6-monthly if lifting people and for lifting accessories/weekly inspections.

5. Preparation - Details of any permit approvals, notices or completion of other work needed prior to starting work

6. Safety and health - Safety and health of all who may be affected (employees/third parties), including anticipated hazards and required precautions (included or by reference to risk assessment).

7. Environment - Anticipated hazards or special conditions requiring precautions and appropriate mitigation measures.

8. Emergency procedures - Procedures and arrangements for dealing with health, safety or environmental incidents and accidents (overarching is company/site management incident investigation process).

9. Method and sequence - Definition of how the work is to be carried out, including the proposed sequence and any temporary works. (Required for complex operations only.)

10. Protection - Protection of partly and fully completed work against damage, deterioration, third parties and/or the public.

11. Inspections/checks/tests - Required prior to, during and on completion of work. Any hold points where approval to continue is required and who can release them.

12. Records - To be obtained or produced during and on completion of the work

  • Download PDF

    Download PDF

  • Save to Novade

    Save to Novade

Risk assessment and method statement review

General Information

Add Photo Documentation


samplesample with link badge

Check - Guidance on aspects that should be covered

1. Scope of work - Brief description of work with scope defined by area, floor or structure (where specified conditions dictate). Should also define any limitations of use and must be site specific.

2. Organisation - Key staff involved in managing and supervising the work and the anticipated type of labour required, including any required induction, training and proof of competence

3. Materials - Materials required, including storage location, any identifying marks and anyspecial safety measures to be taken during storage, handling, use and protection. COSHH details as required.

4. Plant/equipment - Major plant and equipment required, including any lifting equipment and anyplant or equipment calibration/certification/thorough examinations: 12-monthlyor 6-monthly if lifting people and for lifting accessories/weekly inspections.

5. Preparation - Details of any permit approvals, notices or completion of other work needed prior to starting work

6. Safety and health - Safety and health of all who may be affected (employees/third parties), including anticipated hazards and required precautions (included or by reference to risk assessment).

7. Environment - Anticipated hazards or special conditions requiring precautions and appropriate mitigation measures.

8. Emergency procedures - Procedures and arrangements for dealing with health, safety or environmental incidents and accidents (overarching is company/site management incident investigation process).

9. Method and sequence - Definition of how the work is to be carried out, including the proposed sequence and any temporary works. (Required for complex operations only.)

10. Protection - Protection of partly and fully completed work against damage, deterioration, third parties and/or the public.

11. Inspections/checks/tests - Required prior to, during and on completion of work. Any hold points where approval to continue is required and who can release them.

12. Records - To be obtained or produced during and on completion of the work