Service Chart | HPCO2

GENERAL INFORMATION

High Pressure CO2 System

Description of Inspection / Test

1 Release system and distribution valves secured to prevent accidental dischare

2 Contents in cylinders checked by manual weighing

3 Time delay devices tested for correct setting

4 Servo tubing / pilot lines pressure tested at maxinmum working pressure and checked for leakages and blockage

Commets: Performed and/or Recommended Actions are listed on Service Chart SAMRR - ''Summary of Actions''.

This is to confirm that the following equipment(s) have been periodically inspected by the undersigned in accordance with IMO resolution MSC.1/Circ.1318.

G.M.S. Representative - Signature


sample signature
  • Download PDF

    Download PDF

  • Save to Novade

    Save to Novade

Service Chart | HPCO2

GENERAL INFORMATION

High Pressure CO2 System

Description of Inspection / Test

1 Release system and distribution valves secured to prevent accidental dischare

2 Contents in cylinders checked by manual weighing

3 Time delay devices tested for correct setting

4 Servo tubing / pilot lines pressure tested at maxinmum working pressure and checked for leakages and blockage

Commets: Performed and/or Recommended Actions are listed on Service Chart SAMRR - ''Summary of Actions''.

This is to confirm that the following equipment(s) have been periodically inspected by the undersigned in accordance with IMO resolution MSC.1/Circ.1318.

G.M.S. Representative - Signature


sample signature