1 Release system and distribution valves secured to prevent accidental dischare
2 Contents in cylinders checked by manual weighing
3 Time delay devices tested for correct setting
4 Servo tubing / pilot lines pressure tested at maxinmum working pressure and checked for leakages and blockage
Commets: Performed and/or Recommended Actions are listed on Service Chart SAMRR - ''Summary of Actions''.
This is to confirm that the following equipment(s) have been periodically inspected by the undersigned in accordance with IMO resolution MSC.1/Circ.1318.
G.M.S. Representative - Signature
Download PDF
Save to Novade
Service Chart | HPCO2
Description of Inspection / Test
1 Release system and distribution valves secured to prevent accidental dischare
2 Contents in cylinders checked by manual weighing
3 Time delay devices tested for correct setting
4 Servo tubing / pilot lines pressure tested at maxinmum working pressure and checked for leakages and blockage
Commets: Performed and/or Recommended Actions are listed on Service Chart SAMRR - ''Summary of Actions''.
This is to confirm that the following equipment(s) have been periodically inspected by the undersigned in accordance with IMO resolution MSC.1/Circ.1318.
G.M.S. Representative - Signature