Service Chart | HPCTR

Author: Novade Solutions

Published on: 11/18/2022

Service Chart | HPCTR

GENREAL INFORMATION

WORKING CODES: 1. Contents checked by level | 2. Contentes checked by weight |3. Contents checked by pressure | 4. Internal / external inspection

5. Recharging | 6. Hydrostatic test | 7. Vavle renewal | 8. Valve repair | 9. External maintenance | 10. New Cylinder

Break Down

Comments: Performed and/or Recommended Actions are listed on Service Chart SAMRR - ''Summary of Actions''

This is to confirm that the following equipment (s) have been periodically inspected by the undersigned in accordance with IMO resolution MSC.1/ Cire.1432./ Cire.1318 (Fixed CO2 Fire-Ext System)

G.M.S Representative - Signature


sample signature
  • Download PDF

    Download PDF

  • Save to Novade

    Save to Novade

Service Chart | HPCTR

GENREAL INFORMATION

WORKING CODES: 1. Contents checked by level | 2. Contentes checked by weight |3. Contents checked by pressure | 4. Internal / external inspection

5. Recharging | 6. Hydrostatic test | 7. Vavle renewal | 8. Valve repair | 9. External maintenance | 10. New Cylinder

Break Down

Comments: Performed and/or Recommended Actions are listed on Service Chart SAMRR - ''Summary of Actions''

This is to confirm that the following equipment (s) have been periodically inspected by the undersigned in accordance with IMO resolution MSC.1/ Cire.1432./ Cire.1318 (Fixed CO2 Fire-Ext System)

G.M.S Representative - Signature


sample signature