Site Observation Audit - Work at Height - MEWPS

Author: Novade Solutions

Published on: 10/11/2021

Site Observation Audit - Work at Height - MEWPS

General Information

Site Details

Phase of work

Type Of Refurbishment

Number Of Operatives On Site Today (including sub-contracted personnel)

*Please select:

What Is The Planned Total Duration Of The Work On This Site?

Checklist items

*Overhead hazards

*Poor ground condition (eg uneven/ soft ground / excess materials)

*Guardrails missing, damaged or incorrect placement

*Toeboards missing, damaged or incorrect placement

*Missing or damaged emergency stop

General Notes (Optional)

Additional attachments:


samplesample with link badge

  • Download PDF

    Download PDF

  • Save to Novade

    Save to Novade

Site Observation Audit - Work at Height - MEWPS

General Information

Site Details

Phase of work

Type Of Refurbishment

Number Of Operatives On Site Today (including sub-contracted personnel)

*Please select:

What Is The Planned Total Duration Of The Work On This Site?

Checklist items

*Overhead hazards

*Poor ground condition (eg uneven/ soft ground / excess materials)

*Guardrails missing, damaged or incorrect placement

*Toeboards missing, damaged or incorrect placement

*Missing or damaged emergency stop

General Notes (Optional)

Additional attachments:


samplesample with link badge