Site Observation Audit - Work at Height - Scaffold Tower

Author: Novade Solutions

Published on: 10/11/2021

Site Observation Audit - Work at Height - Scaffold Tower

General information

Site details

Phase of work

Type of refurbishment

Number of operatives on site today (including sub-contracted personnel)

*Please select:

What is the planned total duration of the work on this site?

Checklist items

*Boards missing, damaged or incorrect placement

*Guardrails missing, damaged or incorrect placement

*Toeboards missing, damaged or incorrect placement

*Overhead hazards

*Base of scaffold not locked in position/poor ground/excess materials

*Outriggers/stabilisers missing or damaged

*Absent/insufficient safety and warning signage (eg scafftags)

General Notes (Optional)

Additional attachments:


samplesample with link badge

  • Download PDF

    Download PDF

  • Save to Novade

    Save to Novade

Site Observation Audit - Work at Height - Scaffold Tower

General information

Site details

Phase of work

Type of refurbishment

Number of operatives on site today (including sub-contracted personnel)

*Please select:

What is the planned total duration of the work on this site?

Checklist items

*Boards missing, damaged or incorrect placement

*Guardrails missing, damaged or incorrect placement

*Toeboards missing, damaged or incorrect placement

*Overhead hazards

*Base of scaffold not locked in position/poor ground/excess materials

*Outriggers/stabilisers missing or damaged

*Absent/insufficient safety and warning signage (eg scafftags)

General Notes (Optional)

Additional attachments:


samplesample with link badge