General information

Site details

Phase of work

Type of refurbishment

Number of operatives on site today (including sub-contracted personnel)

*Please select:

What is the planned total duration of the work on this site?

Checklist items

*Boards missing, damaged or incorrect placement

*Guardrails missing, damaged or incorrect placement

*Toeboards missing, damaged or incorrect placement

*Unguarded loading points

*Base of scaffold - excess materials, erected on soft/unstable/uneven ground, missing base plates

*Absent/insufficient safety and warning signage (eg scafftags)

General Notes (Optional)

Additional attachments:


samplesample with link badge

  • Download PDF

    Download PDF

  • Save to Novade

    Save to Novade

Site Observation Audit - Work at Height - Scaffolding

General information

Site details

Phase of work

Type of refurbishment

Number of operatives on site today (including sub-contracted personnel)

*Please select:

What is the planned total duration of the work on this site?

Checklist items

*Boards missing, damaged or incorrect placement

*Guardrails missing, damaged or incorrect placement

*Toeboards missing, damaged or incorrect placement

*Unguarded loading points

*Base of scaffold - excess materials, erected on soft/unstable/uneven ground, missing base plates

*Absent/insufficient safety and warning signage (eg scafftags)

General Notes (Optional)

Additional attachments:


samplesample with link badge