Wood Wall Panelling Checklist

Author: Novade Solutions

Published on: 3/29/2022

Wood Wall Panelling

General Information

A.SUBMITTALS

*A.1.1 Materials type:

*A.1.2 Brand:

*A.1.3 Origin:

*A.1.4 Type of Joint:

*A.1.5 Conformance to ASTM or Phil. Lumber standards:

*A.1.6 Conformance to Grading Rule Requirements:

*A.1.7 Physical sample:

*A.1.8 Moisture Content:

*A.2 Shopdrawings:

B.INSTALLATIONS

*B.1 Reference points/elevation availvable:

*B.2 Correct dimensions, profiles and details:

*B.3 Moisture content of finish carpentry on relative existing humidity conditions:

*B.4 Adherence to required treatment:

*B.5 Free from warping, inconsistencies, nicks and damages:

*B.6 Conformance to surface requirements, sizes or patterns:

*B.7 Plumbness and alignment with adjacent materials:

*B.8 Proper installation (supports & adherence)

*B.9 Adequate sealants/compound requirements:

*B.10 Protection after installation:

*B.11 Concrete wall substrate properly treated (if required):

*B.12 Cleaning:

C.OTHERS

*C.1 Proper storage of materials

General Notes

Attachment(s):


samplesample with link badge

  • Download PDF

    Download PDF

  • Save to Novade

    Save to Novade

Wood Wall Panelling

General Information

A.SUBMITTALS

*A.1.1 Materials type:

*A.1.2 Brand:

*A.1.3 Origin:

*A.1.4 Type of Joint:

*A.1.5 Conformance to ASTM or Phil. Lumber standards:

*A.1.6 Conformance to Grading Rule Requirements:

*A.1.7 Physical sample:

*A.1.8 Moisture Content:

*A.2 Shopdrawings:

B.INSTALLATIONS

*B.1 Reference points/elevation availvable:

*B.2 Correct dimensions, profiles and details:

*B.3 Moisture content of finish carpentry on relative existing humidity conditions:

*B.4 Adherence to required treatment:

*B.5 Free from warping, inconsistencies, nicks and damages:

*B.6 Conformance to surface requirements, sizes or patterns:

*B.7 Plumbness and alignment with adjacent materials:

*B.8 Proper installation (supports & adherence)

*B.9 Adequate sealants/compound requirements:

*B.10 Protection after installation:

*B.11 Concrete wall substrate properly treated (if required):

*B.12 Cleaning:

C.OTHERS

*C.1 Proper storage of materials

General Notes

Attachment(s):


samplesample with link badge